Pheasant Lane Residence

Location: Southampon, NY

Project Duration: 13 Months

 

About this Project

CMM Sitework started working on this project in May of 2015. There was an existing house on the site that was demolished and removed, we then stripped and stockpiled approximately 3000 cubic yards of topsoil. We then excavated for a 5000 Sq. Ft. 12’ deep foundation and then provided the equipment and labor necessary to backfill and compact. We excavated for a sunken tennis court and a pool house with a full foundation basement underneath it. CMM Sitework installed conventional septic systems for both the main house and the pool house. CMM Sitework also installed all of the necessary drywells for the main house, pool house and the sunken tennis court, including PVC piping. We imported and graded approximately 2,500 cubic yards of fill and used all excavated materials on the site to establish final sub grades. We supplied and installed RCA sub base material for all motor court yard and driveway areas. Finally we supplied the equipment and labor to relocate all of the stockpiled topsoil and used it for final landscape grading. CMM Sitework, Inc. completed their scope of work on time and on budget in June 2016.
I have had the pleasure to work with Bill Potabi and CMM for over 15 years from small to large projects and have always been impressed with Bill’s knowledge and clear communication on every project as well as the professionalism of his crews.

Project Manager, Koral Bros. Inc.

2017-06-04T10:43:50+00:00

Project Manager, Koral Bros. Inc.

Stephen Napoli